Chemical Piping Fabrication and Installation
A producer of mining chemicals contracted DRM to provide the process piping fabrication and installation for a new tank system. DRM worked with the end client to insure all safety, environmental and durability concerns were met. All applicable joints were fabricated and tested at our facility, then transported to the job site to final installation and testing.
Ring Line Design and Installation
A second tier automotive interior supplier came to DRM requiring a hurried installation of a RIM (Reaction Injection Molding) ring line design and installation. The Japanese Tsunami of 2011 caused this OEM to move dash molding to a stateside client facility. DRM, expert in RIM equipment, took existing facility equipment and fashioned a ring line to complete this molding effort. Chemical piping, hydraulics, controls updates and diverter stations were all built, shipped and installed to make certain the client was able to support the OEM as desired. |
|