PANEL
NETWORKS
HVAC
construction
design
affilations
directions

home s Training contactDRM Controls
automotive
 
Project Profile: DANA – MLS Assembly Cell
•Integrated Six ABB IRB-140 Robots
Cycle rate of 4.28 sec/cycle met and exceeded cycle time requirements.
Vision and gauge tests for proper layering of stainless gaskets.
Developed Quick-Change tooling and procedure for safe operator exchange of tooling.
Safety curtains, line-interlocks and DC (stall-able) Load/Unload trees all designed with operator safety as the prime consideration.

DANA

Dana wanted to automate a very manually intensive gasket assembly cell. 

Production rates must be met with minimal operators and safety as a primary concern. 

This cell has been in operation for 6 years and continues to be their most efficient cell.

.

DANA

 
   
 

DRM L.L.C.
 
520 Crews St.
Lawrenceburg, TN 38464
 
Office:  931-766-4500  
Fax: 931-762-5314  
email: info@drmcontrols.com  
  directions  
data
turnkey
process controls
combustion & control
machine rebuild
site mamagement
test equipment
spray applications
 
 
 
 
INDUSTRIES WE SERVE:
AUTOMOTIVE / FOOD & BEVERAGE / FOUNDRY / MANUFACTURING / CHEMICAL / ENVIRONMENTAL
PLANT SOLUTIONS:
INDUSTRIAL SERVICES:
ABOUT US:

 
automotive
food & beverage
foundry
manufacturing
chemical
environmental